Colbros were engaged to replace the existing main switch board at the commonwealth bank at Chatswood.
This was carried out with no interruption to the banks operation.
Colbros were engaged to replace the existing main switch board at the commonwealth bank at Chatswood.
This was carried out with no interruption to the banks operation.